Invest Phuket
Anfrage senden
AYANA Heights Seaview Residence

AYANA Heights Seaview Residence

LayanVorverkaufWohnung

฿8.36M – ฿26.5M

Immobilientyp
Eigentumswohnung
Wohneinheiten gesamt
549
Fläche
40,9–92,04 m²
Schlafzimmer
1–3
Preis / m²
฿190K
Lage
Layan
Status
Vorverkauf
Eigentumsform
Freehold / Leasehold
Fertigstellung
Neubau vor Fertigstellung

Lage

Layan

AYANA Heights Seaview Residence

In Google Maps öffnen
Layan Beach
3-5 min
Zone Laguna und Bang Tao
10-15 min
Porto de Phuket
15 min
Phuket Internationaler Flughafen
25 min

Residenzen & Grundrisse

TypFlächePreis
1 Schlafzimmer40.9 m²Auf Anfrage →
2 Schlafzimmer64.38 m²Auf Anfrage →
3 Schlafzimmer92.04 m²Auf Anfrage →

Grundrisse und Lageplan

1 / 3

Videotour

Ausstattung & Lifestyle

Poolbereich im Resortstil

Ein dramatisches Multi-Pool-Herzstück mit angelegten Terrassen, Lounge-Bereichen und einem Fünf-Sterne-Resort-Feeling vom ersten Eindruck an.

Eingangshof und Lobby

Eingangshof, Wasserspiel und Lobby bereiten Bewohnern und Gästen bei jeder Ankunft einen erstklassigen Empfang.

Arbeit und Wellness

Co-Working-, Lounge-, Fitness-, Sauna- und Wellnessbereiche für den Alltag und für Gäste mit längeren Aufenthalten.

Privates Wohnen mit Meerblick

Ausgewählte Grundrisse öffnen sich zu Balkonen mit Meerblick – ob Sie selbst hier wohnen oder die Residenz vermieten möchten.

Verifiziertes Update der Quelle

Baufortschritt

August 2026
August 2026

AYANA Heights — construction update · August 2026

AYANA Heights Seaview Residences continue to progress nicely this month. Building H leads the way, now well into architectural and MEP installation work, while Buildings E, F, and G have completed their structural frames, with F progressing to roof floor construction. Building C is taking shape with pool construction advancing alongside its 6th floor. Building B has reached its 6th floor with column work underway and Building D has completed its foundation and moved into MEP installation. Across the site, retaining wall works continue to strengthen our community's foundations for the Seaview lifestyle ahead.

Juli 2026

AYANA Heights — construction update · July 2026

AYANA Heights Seaview Residences continue to progress nicely this month. Building H leads the way, now well into architectural and MEP installation work, while Buildings E, F, and G have completed their structural frames, with F progressing to roof floor construction. Building C is taking shape with pool construction advancing alongside its 6th floor. Building B has reached its 6th floor with column work underway and Building D has completed its foundation and moved into MEP installation. Across the site, retaining wall works continue to strengthen our community's foundations for the Seaview lifestyle ahead.

Juni 2026

AYANA Heights — construction update · June 2026

AYANA Heights Seaview Residences is advancing very well this month. Building H leads the way, now moving into architectural and interior installation work, while Buildings E and G have completed their structural frames and progressed to Cera wall and MEP fit-out. Building F continues rising with column work on its 6th floor, and Building C is taking shape with pool construction and column work underway on the 5th floor. Buildings A and D remain in advanced foundation stages. Across the site, road and retaining wall works continue to strengthen our community's foundations for the sea view lifestyle ahead

Mai 2026

AYANA Heights — Baustellenbericht · Mai 2026

In den Gebäuden G und H schreiten die Montage der Cera-Wände und die Arbeiten an der technischen Gebäudeausrüstung zügig voran. In Gebäude F werden die Stützen des 4. Geschosses errichtet. Der Rohbau von Gebäude C erreicht inzwischen das 3. Geschoss; auch der Bau des Pools hat begonnen. Die Fundamentarbeiten für die Gebäude A und D laufen weiterhin kontinuierlich nach Zeitplan.

April 2026

AYANA Heights — construction update · April 2026

AYANA Heights is making impressive strides, with Buildings G and H now at 99% structural completion and actively advancing into Cera wall cladding and MEP installation. Building E has reached the 6th floor construction phase, marking a significant visual milestone for the development. Building F progresses strongly through its 3rd floor columns. Buildings B and C continue floor and structural work, as foundations for Buildings A and D advance steadily on schedule.

März 2026

AYANA Heights — construction update · March 2026

AYANA Heights continues to rise impressively, with Buildings G and H leading the way at 98% structural completion, now advancing into Cera wall cladding and MEP installation. Building E has reached the 5th floor construction phase, while Building F progresses steadily through its 2nd floor. Buildings B and C are advancing with column and structural work well underway, as foundations for Buildings A and D continue to progress confidently on schedule.

Februar 2026

AYANA Heights — construction update · February 2026

Buildings G and H are leading progress, both reaching 97% structural completion with teams now focused on stair construction, MEP work, and Cera wall installation. Building E has advanced to the 3rd floor (32% structural), while Building B is progressing with its first-floor slab and water tank construction. Foundation work is nearing total completion across the site, with Building A reaching 89% as it transitions into column and beam construction for the water tank.

Januar 2026

AYANA Heights — construction update · January 2026

Development at AYANA Heights remains on schedule with significant milestones achieved this January. Foundation work for Buildings B, C, E, F, G, and H is now 100% complete, while Building A has reached 75%. Vertical progress is most visible at Building H, which has reached 95% structural completion, followed by Building G at 85%, with teams now proceeding to the roof floor. Building E structural work is at 10% and Building F at 2% as we transition into floor and slab construction. Building B is currently focused on basement floor flat slab work and retaining walls, while Buildings A, C, and D proceed with column, beam, and footing construction.

Dezember 2025

AYANA Heights — construction update · December 2025

Development at AYANA Heights remains on schedule, with significant milestones achieved in December. Foundation work for Buildings E, F, G, and H is now 100% complete. Additionally, pile driving for Buildings A, B, and D has been successfully finalized. Vertical progress is most visible at Building H, which has reached 47% structural completion, followed by Building G is at 30%. Current on-site activities focus on pile cutting and the initial construction of columns and walls. We remain committed to maintaining this momentum as we transition fully into the structural phase.

November 2025

AYANA Heights — construction update · November 2025

Construction at AYANA Heights Seaview Residences shows steady progress across all buildings. Building A has completed pile driving and moved to pile cutting, while Building B advances with pile cutting and footing work. Building C continues with pile cutting, rebar footing, and column preparation. Building D progresses with soil excavation and pile operations, while Buildings E and F advance through raft foundation and wall construction. Building G moves into column and scaffolding work, and Building H advances to second-floor structural progress. Infrastructure also continues, with Road Zone 1 retaining wall completed and Zones 2-4 moving through soil and pile operations.

Oktober 2025

AYANA Heights — construction update · October 2025

Progress continues at AYANA Heights Seaview Residences, with steady development across all buildings. From initial pile driving to first-floor construction, each residence is advancing toward completion. Building H leads at 21% progress, while infrastructure in Road Zones 1–4 moves ahead.

September 2025

AYANA Heights — construction update · September 2025

Building B has commenced pile driving operations at 3% progress with dynamic pile testing underway. Building C has completed pile driving and is proceeding with pile cutting at 10% completion. Building D is advancing with soil excavation and dynamic pile testing. Buildings E and G continue pile cutting work at 10% progress. Building F has reached 10% completion, proceeding with raft foundation construction and rock drilling. Building H demonstrates the highest progress at 12%, advancing with raft foundation construction. Road Zone 1 retaining wall work is completed at 10%, while Road Zones 2-4 progress with pile driving and soil cutting operations.

August 2025

AYANA Heights — construction update · August 2025

Building E has completed 100% of piling work with retaining wall construction at 90% and pile cutting work advancing at 20%. Building F has achieved full completion of piling, excavation footing, and pile cutting work. Building G has finished piling work entirely with pile cutting progressing at 30%. Building H demonstrates outstanding progress with 100% completion of both piling and pile cutting work. Building C has prepared the construction area and commenced piling operations. The retaining wall construction maintains 100% completion for both footing and wall concrete pouring with backfill work ongoing.

Juli 2025

AYANA Heights — construction update · July 2025

Building E has advanced significantly with pile cutting work ongoing and retaining wall construction at 90% completion. Building F shows solid progress with new bored pile work underway and footing excavation in progress. Building G is preparing for new needle drilling work, while Building H has achieved 50% completion on bored pile operations. Building C has completed piling work with dynamic testing on 800mm diameter piles, and the retaining wall construction has reached 100% completion for both footing and wall concrete pouring, with backfill soil work now underway.

Juni 2025

AYANA Heights — construction update · June 2025

The AYANA Heights Seaview Residence continues its upward momentum, with construction across key buildings and infrastructure moving steadily forward as of Week 21 (ending June 27, 2025). Piling is now 100% complete for Buildings E, G, and H. Building F is also well underway with over half of its pile work completed (195 of 386 piles installed). Pile cutting activities are ongoing across several buildings: 222 piles are done for Building E, 94 for Building F, and 79 for Building H. Retaining wall works near the pavilion have reached the concrete pouring and formwork stage, showing visible progress on site. Soil cutting for Building C and the internal road is now complete, which enables the next stages of foundation and structure work to begin. Bore pile work for Building C is awaiting access via the temporary road, and revisions to the pile design are in process. Off-site, the deep well for water supply is complete, and AYANA is now queued for connection to the private waterworks system. A new tower crane is being prepped for installation, providing enhanced lifting capacity to support upcoming vertical works.

Mai 2025

AYANA Heights — construction update · May 2025

Building E has now completed 100% of its piling work, with 90% of pile foundation cutting completed. The reinforced concrete tie retaining wall is now also in place, establishing a critical element of the building’s structural integrity. Building F is advancing steadily, with piling work now over halfway complete at 51%. Pile foundation cutting stands at 40%, marking consistent movement toward structural development. Building G has completed all piling work, with pile foundation cutting at 35%, a strong indication of ongoing momentum on-site. Building H mirrors similar progress, with piling work finalized and pile foundation cutting now reaching 64%, bringing this building into the next phase of its structural development. Meanwhile, Building C has completed 100% of its earthwork excavation. This foundational milestone paves the way for subsequent structural activity to commence without delay.

April 2025

AYANA Heights — construction update · April 2025

Building E: Piling completed 100%. Building F: Piling completed 100%. Building G: Piling completed 100%. Building H: Piling completed 100%. Buildings E, F, G, and H: Pile cutting work completed 5%. Building C: Excavation completed 100%, preparing for piling.

März 2025

AYANA Heights — construction update · March 2025

Building E – Piling work 80% complete. Building F – Piling work 40% complete. Building G – Piling work 100% complete. Building H – Piling work 100% complete.

Februar 2025

AYANA Heights — construction update · February 2025

Ayana Heights Seaview Residences moving forward with the preparation work for construction and have begun the process of cement-reinforced concrete piling, which is a crucial step in ensuring the long-term strength and stability of the foundation This phase is an essential part of preparing the site and laying the groundwork for the premium sea-view residences, and we look forward to providing an unparalleled living experience for future owners and clients.

Januar 2025

AYANA Heights — construction update · January 2025

AYANA recently held a groundbreaking ceremony for AYANA Heights, a new luxury ocean-view apartment project in Layan. The event included blessings and prayers for the project's success and featured a ribbon-cutting ceremony to officially launch construction.

Über das Projekt

AYANA Heights Seaview Residence ist ein Neubauprojekt in Layan, Phuket. Invest Phuket ist eine unabhängige Beratung — wir arbeiten mit allen Projekten der Insel und verhandeln für Sie direkt mit dem Vertriebsbüro des Bauträgers.

Bauträger: T.H. Group Phuket Co., Ltd. · Bauträgerprofil →

Eigene Projektwebsite: Projektseite öffnen ↗

Fragen von Käufern

›Kann ich die heutigen Preise für Ayana Heights erhalten?

Ja. Nutzen Sie das Formular oder den WhatsApp-Button, und wir senden Ihnen aktuelle Preise, Beispielgrundrisse und die Verfügbarkeit.

›Wo befindet sich Ayana Heights?

Ayana Heights liegt im Gebiet Layan auf Phuket, nahe dem Layan Beach; Laguna, Bang Tao, Porto de Phuket und der Flughafen sind schnell erreichbar.

›Welche Wohnungstypen gibt es?

Es gibt Studios, Wohnungen mit 1 und 2 Schlafzimmern sowie größere Familiengrundrisse; für mehrere Wohnungstypen liegen Beispielgrundrisse vor.

›Ist Ayana Heights für ausländische Käufer geeignet?

Ja. Das Projekt bietet sowohl Freehold als auch Leasehold, sodass internationale Käufer die passende Eigentumsform wählen können.

›Was sollte ich fragen, bevor ich eine Entscheidung treffe?

Fragen Sie nach den heutigen Preisen, den Grundrissen, dem Zahlungsplan sowie nach der genauen Lage der Einheit und der Ausrichtung ihres Meerblicks.

Preise, Verfügbarkeit und Zahlungspläne ändern sich wöchentlich und werden vom Bauträger zum Zeitpunkt der Anfrage bestätigt. Invest Phuket ist eine unabhängige Beratung für Neubauimmobilien.

Preisliste erhalten